Rusha Bridge
This project was carried out for West Lothian Council to replace a short span road bridge that was life expired.
The works included demolition of the existing bridge deck and parapets, repairs to stone abutments, installation of new precast concrete deck slabs, waterproofing, kerbing and resurfacing and construction of new masonry parapets.
All work were carried out under a road closure which allowed construction to proceed quickly and ensured that this important link in the local road network could be reinstated with minimal disruption to the public.